The new rehearsal and workshop centre for the Bavarian State Theatre in Munich is nearing completion. Covering a usable area of around 12,500 square metres, the building will house three rehearsal stages, storage areas, a metal workshop, a joinery workshop, an assembly hall, a painting studio, and costume and prop stores.

To ensure optimum humidity levels, the Bavarian State Theatre has opted for a Finestfog humidification system. The constant humidity protects materials such as wood from drying out, warping and cracking. At the same time, it ensures a pleasant indoor climate that promotes the well-being and health of staff.